Roofing and waterproofing SWMS
Civil & Infrastructure Waterproofing SWMS
Waterproofing on civil and infrastructure works, with plant, traffic and confined-space controls.
✓ Editable Microsoft Word✓ Instant download after payment✓ State-specific WHS Regulation
What this SWMS covers
- Waterproofing to structures, tanks and decks
- Working around mobile plant and traffic
- Confined-space entry where triggered
- Surface prep and membrane application at scale
How it works
- Pick your state — the document is written to the WHS Regulation in force there.
- Pay once — card checkout, no account, no subscription.
- Download & edit — the Word file is emailed and downloadable straight away. Add your ABN, site and crew, brief the team, and you’re ready.
What you get
A complete, editable Safe Work Method Statement for civil & infrastructure waterproofing, in Microsoft Word — not a locked PDF. It sets out the activity, its hazards and the control measures, ready for you to add your site-specific detail before work starts. Available for all 8 states you can select at checkout. It remains a template until you complete it and consult your workers, as the WHS Regulation requires.